Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

Case Study SWOT Analysis Solution

Case Study Description of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management


This case describes the implementation and subsequent failure of an innovative system installed in the bars of Alvalade XXI, the recently built football stadium in Lisbon, Portugal. Casa XXI, the company running the bars, had entrusted the project to an IT supplier who had limited experience with large systems. During the inauguration, the system failed spectacularly creating a chaotic situation. The fiasco meant not only a financial loss, but also a blow to the reputation of the company. The management blamed the supplier for the failure. The supplier, however, claimed that the problem was not technical but organizational, that is, poor planning of operations. Subsequent tests were inconclusive and failed to restore trust. At the end of the case, the CEO is considering the possibility to switch to an alternative supplier. He also wonders what they could have done to manage the project and the associated risks more effectively. The case highlights risk and project management issues in large systems implementations. The discussion can be structured around cost/benefit analysis, risk assessment, and project management. Relevant dimensions include: company operations, project scope, degree of innovation, technology used, system architecture, supplier selection, and project organization. In addition, the case raises governance questions: Who is responsible for the project? Even if the project is outsourced, how should the roles and responsibilities be apportioned between the company and the IT supplier(s)? What mechanisms should be used to plan and execute IT projects, and control their risks?

Authors :: Ramon O'Callaghan

Topics :: Technology & Operations

Tags :: IT, Operations management, Project management, Risk management, SWOT Analysis, SWOT Matrix, TOWS, Weighted SWOT Analysis

Swot Analysis of "Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management" written by Ramon O'Callaghan includes – strengths weakness that are internal strategic factors of the organization, and opportunities and threats that Xxi Supplier facing as an external strategic factors. Some of the topics covered in Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management case study are - Strategic Management Strategies, IT, Operations management, Project management, Risk management and Technology & Operations.


Some of the macro environment factors that can be used to understand the Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management casestudy better are - – there is backlash against globalization, increasing government debt because of Covid-19 spendings, increasing inequality as vast percentage of new income is going to the top 1%, customer relationship management is fast transforming because of increasing concerns over data privacy, cloud computing is disrupting traditional business models, there is increasing trade war between United States & China, increasing energy prices, banking and financial system is disrupted by Bitcoin and other crypto currencies, technology disruption, etc



12 Hrs

$59.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

24 Hrs

$49.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

48 Hrs

$39.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now







Introduction to SWOT Analysis of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management


SWOT stands for an organization’s Strengths, Weaknesses, Opportunities and Threats . At Oak Spring University , we believe that protagonist in Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management case study can use SWOT analysis as a strategic management tool to assess the current internal strengths and weaknesses of the Xxi Supplier, and to figure out the opportunities and threats in the macro environment – technological, environmental, political, economic, social, demographic, etc in which Xxi Supplier operates in.

According to Harvard Business Review, 75% of the managers use SWOT analysis for various purposes such as – evaluating current scenario, strategic planning, new venture feasibility, personal growth goals, new market entry, Go To market strategies, portfolio management and strategic trade-off assessment, organizational restructuring, etc.




SWOT Objectives / Importance of SWOT Analysis and SWOT Matrix


SWOT analysis of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management can be done for the following purposes –
1. Strategic planning using facts provided in Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management case study
2. Improving business portfolio management of Xxi Supplier
3. Assessing feasibility of the new initiative in Technology & Operations field.
4. Making a Technology & Operations topic specific business decision
5. Set goals for the organization
6. Organizational restructuring of Xxi Supplier




Strengths Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management | Internal Strategic Factors
What are Strengths in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The strengths of Xxi Supplier in Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management Harvard Business Review case study are -

Operational resilience

– The operational resilience strategy in the Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management Harvard Business Review case study comprises – understanding the underlying the factors in the industry, building diversified operations across different geographies so that disruption in one part of the world doesn’t impact the overall performance of the firm, and integrating the various business operations and processes through its digital transformation drive.

Cross disciplinary teams

– Horizontal connected teams at the Xxi Supplier are driving operational speed, building greater agility, and keeping the organization nimble to compete with new competitors. It helps are organization to ideate new ideas, and execute them swiftly in the marketplace.

Strong track record of project management

– Xxi Supplier is known for sticking to its project targets. This enables the firm to manage – time, project costs, and have sustainable margins on the projects.

Low bargaining power of suppliers

– Suppliers of Xxi Supplier in the sector have low bargaining power. Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management has further diversified its suppliers portfolio by building a robust supply chain across various countries. This helps Xxi Supplier to manage not only supply disruptions but also source products at highly competitive prices.

Ability to recruit top talent

– Xxi Supplier is one of the leading recruiters in the industry. Managers in the Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management are in a position to attract the best talent available. The firm has a robust talent identification program that helps in identifying the brightest.

Analytics focus

– Xxi Supplier is putting a lot of focus on utilizing the power of analytics in business decision making. This has put it among the leading players in the industry. The technology infrastructure suggested by Ramon O'Callaghan can also help it to harness the power of analytics for – marketing optimization, demand forecasting, customer relationship management, inventory management, information sharing across the value chain etc.

Learning organization

- Xxi Supplier is a learning organization. It has inculcated three key characters of learning organization in its processes and operations – exploration, creativity, and expansiveness. The work place at Xxi Supplier is open place that encourages instructiveness, ideation, open minded discussions, and creativity. Employees and leaders in Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management Harvard Business Review case study emphasize – knowledge, initiative, and innovation.

Sustainable margins compare to other players in Technology & Operations industry

– Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management firm has clearly differentiated products in the market place. This has enabled Xxi Supplier to fetch slight price premium compare to the competitors in the Technology & Operations industry. The sustainable margins have also helped Xxi Supplier to invest into research and development (R&D) and innovation.

Successful track record of launching new products

– Xxi Supplier has launched numerous new products in last few years, keeping in mind evolving customer preferences and competitive pressures. Xxi Supplier has effective processes in place that helps in exploring new product needs, doing quick pilot testing, and then launching the products quickly using its extensive distribution network.

Ability to lead change in Technology & Operations field

– Xxi Supplier is one of the leading players in its industry. Over the years it has not only transformed the business landscape in its segment but also across the whole industry. The ability to lead change has enabled Xxi Supplier in – penetrating new markets, reaching out to new customers, and providing different value propositions to different customers in the international markets.

Organizational Resilience of Xxi Supplier

– The covid-19 pandemic has put organizational resilience at the centre of everthing that Xxi Supplier does. Organizational resilience comprises - Financial Resilience, Operational Resilience, Technological Resilience, Organizational Resilience, Business Model Resilience, and Reputation Resilience.

High switching costs

– The high switching costs that Xxi Supplier has built up over years in its products and services combo offer has resulted in high retention of customers, lower marketing costs, and greater ability of the firm to focus on its customers.






Weaknesses Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management | Internal Strategic Factors
What are Weaknesses in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The weaknesses of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management are -

Low market penetration in new markets

– Outside its home market of Xxi Supplier, firm in the HBR case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management needs to spend more promotional, marketing, and advertising efforts to penetrate international markets.

High dependence on existing supply chain

– The disruption in the global supply chains because of the Covid-19 pandemic and blockage of the Suez Canal illustrated the fragile nature of Xxi Supplier supply chain. Even after few cautionary changes mentioned in the HBR case study - Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management, it is still heavily dependent upon the existing supply chain. The existing supply chain though brings in cost efficiencies but it has left Xxi Supplier vulnerable to further global disruptions in South East Asia.

Slow decision making process

– As mentioned earlier in the report, Xxi Supplier has a very deliberative decision making approach. This approach has resulted in prudent decisions, but it has also resulted in missing opportunities in the industry over the last five years. Xxi Supplier even though has strong showing on digital transformation primary two stages, it has struggled to capitalize the power of digital transformation in marketing efforts and new venture efforts.

High cash cycle compare to competitors

Xxi Supplier has a high cash cycle compare to other players in the industry. It needs to shorten the cash cycle by 12% to be more competitive in the marketplace, reduce inventory costs, and be more profitable.

High bargaining power of channel partners

– Because of the regulatory requirements, Ramon O'Callaghan suggests that, Xxi Supplier is facing high bargaining power of the channel partners. So far it has not able to streamline the operations to reduce the bargaining power of the value chain partners in the industry.

Interest costs

– Compare to the competition, Xxi Supplier has borrowed money from the capital market at higher rates. It needs to restructure the interest payment and costs so that it can compete better and improve profitability.

Aligning sales with marketing

– It come across in the case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management that the firm needs to have more collaboration between its sales team and marketing team. Sales professionals in the industry have deep experience in developing customer relationships. Marketing department in the case Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management can leverage the sales team experience to cultivate customer relationships as Xxi Supplier is planning to shift buying processes online.

Lack of clear differentiation of Xxi Supplier products

– To increase the profitability and margins on the products, Xxi Supplier needs to provide more differentiated products than what it is currently offering in the marketplace.

No frontier risks strategy

– After analyzing the HBR case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management, it seems that company is thinking about the frontier risks that can impact Technology & Operations strategy. But it has very little resources allocation to manage the risks emerging from events such as natural disasters, climate change, melting of permafrost, tacking the rise of artificial intelligence, opportunities and threats emerging from commercialization of space etc.

Need for greater diversity

– Xxi Supplier has taken concrete steps on diversity, equity, and inclusion. But the efforts so far has resulted in limited success. It needs to expand the recruitment and selection process to hire more people from the minorities and underprivileged background.

Workers concerns about automation

– As automation is fast increasing in the segment, Xxi Supplier needs to come up with a strategy to reduce the workers concern regarding automation. Without a clear strategy, it could lead to disruption and uncertainty within the organization.




Opportunities Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management | External Strategic Factors
What are Opportunities in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The opportunities highlighted in the Harvard Business Review case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management are -

Harnessing reconfiguration of the global supply chains

– As the trade war between US and China heats up in the coming years, Xxi Supplier can build a diversified supply chain model across various countries in - South East Asia, India, and other parts of the world. This reconfiguration of global supply chain can help, as suggested in case study, Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management, to buy more products closer to the markets, and it can leverage its size and influence to get better deal from the local markets.

Lowering marketing communication costs

– 5G expansion will open new opportunities for Xxi Supplier in the field of marketing communication. It will bring down the cost of doing business, provide technology platform to build new products in the Technology & Operations segment, and it will provide faster access to the consumers.

Loyalty marketing

– Xxi Supplier has focused on building a highly responsive customer relationship management platform. This platform is built on in-house data and driven by analytics and artificial intelligence. The customer analytics can help the organization to fine tune its loyalty marketing efforts, increase the wallet share of the organization, reduce wastage on mainstream advertising spending, build better pricing strategies using personalization, etc.

Reconfiguring business model

– The expansion of digital payment system, the bringing down of international transactions costs using Bitcoin and other blockchain based currencies, etc can help Xxi Supplier to reconfigure its entire business model. For example it can used blockchain based technologies to reduce piracy of its products in the big markets such as China. Secondly it can use the popularity of e-commerce in various developing markets to build a Direct to Customer business model rather than the current Channel Heavy distribution network.

Changes in consumer behavior post Covid-19

– Consumer behavior has changed in the Technology & Operations industry because of Covid-19 restrictions. Some of this behavior will stay once things get back to normal. Xxi Supplier can take advantage of these changes in consumer behavior to build a far more efficient business model. For example consumer regular ordering of products can reduce both last mile delivery costs and market penetration costs. Xxi Supplier can further use this consumer data to build better customer loyalty, provide better products and service collection, and improve the value proposition in inflationary times.

Using analytics as competitive advantage

– Xxi Supplier has spent a significant amount of money and effort to integrate analytics and machine learning into its operations in the sector. This continuous investment in analytics has enabled, as illustrated in the Harvard case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management - to build a competitive advantage using analytics. The analytics driven competitive advantage can help Xxi Supplier to build faster Go To Market strategies, better consumer insights, developing relevant product features, and building a highly efficient supply chain.

Low interest rates

– Even though inflation is raising its head in most developed economies, Xxi Supplier can still utilize the low interest rates to borrow money for capital investment. Secondly it can also use the increase of government spending in infrastructure projects to get new business.

Reforming the budgeting process

- By establishing new metrics that will be used to evaluate both existing and potential projects Xxi Supplier can not only reduce the costs of the project but also help it in integrating the projects with other processes within the organization.

Identify volunteer opportunities

– Covid-19 has impacted working population in two ways – it has led to people soul searching about their professional choices, resulting in mass resignation. Secondly it has encouraged people to do things that they are passionate about. This has opened opportunities for businesses to build volunteer oriented socially driven projects. Xxi Supplier can explore opportunities that can attract volunteers and are consistent with its mission and vision.

Better consumer reach

– The expansion of the 5G network will help Xxi Supplier to increase its market reach. Xxi Supplier will be able to reach out to new customers. Secondly 5G will also provide technology framework to build new tools and products that can help more immersive consumer experience and faster consumer journey.

Redefining models of collaboration and team work

– As explained in the weaknesses section, Xxi Supplier is facing challenges because of the dominance of functional experts in the organization. Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management case study suggests that firm can utilize new technology to build more coordinated teams and streamline operations and communications using tools such as CAD, Zoom, etc.

Remote work and new talent hiring opportunities

– The widespread usage of remote working technologies during Covid-19 has opened opportunities for Xxi Supplier to expand its talent hiring zone. According to McKinsey Global Institute, 20% of the high end workforce in fields such as finance, information technology, can continously work from remote local post Covid-19. This presents a really great opportunity for Xxi Supplier to hire the very best people irrespective of their geographical location.

Developing new processes and practices

– Xxi Supplier can develop new processes and procedures in Technology & Operations industry using technology such as automation using artificial intelligence, real time transportation and products tracking, 3D modeling for concept development and new products pilot testing etc.




Threats Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management External Strategic Factors
What are Threats in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The threats mentioned in the HBR case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management are -

New competition

– After the dotcom bust of 2001, financial crisis of 2008-09, the business formation in US economy had declined. But in 2020 alone, there are more than 1.5 million new business applications in United States. This can lead to greater competition for Xxi Supplier in the Technology & Operations sector and impact the bottomline of the organization.

Barriers of entry lowering

– As technology is more democratized, the barriers to entry in the industry are lowering. It can presents Xxi Supplier with greater competitive threats in the near to medium future. Secondly it will also put downward pressure on pricing throughout the sector.

Backlash against dominant players

– US Congress and other legislative arms of the government are getting tough on big business especially technology companies. The digital arm of Xxi Supplier business can come under increasing regulations regarding data privacy, data security, etc.

Instability in the European markets

– European Union markets are facing three big challenges post Covid – expanded balance sheets, Brexit related business disruption, and aggressive Russia looking to distract the existing security mechanism. Xxi Supplier will face different problems in different parts of Europe. For example it will face inflationary pressures in UK, France, and Germany, balance sheet expansion and demand challenges in Southern European countries, and geopolitical instability in the Eastern Europe.

Learning curve for new practices

– As the technology based on artificial intelligence and machine learning platform is getting complex, as highlighted in case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management, Xxi Supplier may face longer learning curve for training and development of existing employees. This can open space for more nimble competitors in the field of Technology & Operations .

High dependence on third party suppliers

– Xxi Supplier high dependence on third party suppliers can disrupt its processes and delivery mechanism. For example -the current troubles of car makers because of chip shortage is because the chip companies started producing chips for electronic companies rather than car manufacturers.

Easy access to finance

– Easy access to finance in Technology & Operations field will also reduce the barriers to entry in the industry, thus putting downward pressure on the prices because of increasing competition. Xxi Supplier can utilize it by borrowing at lower rates and invest it into research and development, capital expenditure to fortify its core competitive advantage.

Shortening product life cycle

– it is one of the major threat that Xxi Supplier is facing in Technology & Operations sector. It can lead to higher research and development costs, higher marketing expenses, lower customer loyalty, etc.

Regulatory challenges

– Xxi Supplier needs to prepare for regulatory challenges as consumer protection groups and other pressure groups are vigorously advocating for more regulations on big business - to reduce inequality, to create a level playing field, to product data privacy and consumer privacy, to reduce the influence of big money on democratic institutions, etc. This can lead to significant changes in the Technology & Operations industry regulations.

Environmental challenges

– Xxi Supplier needs to have a robust strategy against the disruptions arising from climate change and energy requirements. EU has identified it as key priority area and spending 30% of its 880 billion Euros European post Covid-19 recovery funds on green technology. Xxi Supplier can take advantage of this fund but it will also bring new competitors in the Technology & Operations industry.

Capital market disruption

– During the Covid-19, Dow Jones has touched record high. The valuations of a number of companies are way beyond their existing business model potential. This can lead to capital market correction which can put a number of suppliers, collaborators, value chain partners in great financial difficulty. It will directly impact the business of Xxi Supplier.

Technology disruption because of hacks, piracy etc

– The colonial pipeline illustrated, how vulnerable modern organization are to international hackers, miscreants, and disruptors. The cyber security interruption, data leaks, etc can seriously jeopardize the future growth of the organization.

Technology acceleration in Forth Industrial Revolution

– Xxi Supplier has witnessed rapid integration of technology during Covid-19 in the Technology & Operations industry. As one of the leading players in the industry, Xxi Supplier needs to keep up with the evolution of technology in the Technology & Operations sector. According to Mckinsey study top managers believe that the adoption of technology in operations, communications is 20-25 times faster than what they planned in the beginning of 2019.




Weighted SWOT Analysis of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management Template, Example


Not all factors mentioned under the Strengths, Weakness, Opportunities, and Threats quadrants in the SWOT Analysis are equal. Managers in the HBR case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management needs to zero down on the relative importance of each factor mentioned in the Strengths, Weakness, Opportunities, and Threats quadrants. We can provide the relative importance to each factor by assigning relative weights. Weighted SWOT analysis process is a three stage process –

First stage for doing weighted SWOT analysis of the case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management is to rank the strengths and weaknesses of the organization. This will help you to assess the most important strengths and weaknesses of the firm and which one of the strengths and weaknesses mentioned in the initial lists are marginal and can be left out.

Second stage for conducting weighted SWOT analysis of the Harvard case study Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management is to give probabilities to the external strategic factors thus better understanding the opportunities and threats arising out of macro environment changes and developments.

Third stage of constructing weighted SWOT analysis of Fixing the Payment System at Alvalade XXI: A Case on IT Project Risk Management is to provide strategic recommendations includes – joining likelihood of external strategic factors such as opportunities and threats to the internal strategic factors – strengths and weaknesses. You should start with external factors as they will provide the direction of the overall industry. Secondly by joining probabilities with internal strategic factors can help the company not only strategic fit but also the most probably strategic trade-off that Xxi Supplier needs to make to build a sustainable competitive advantage.



--- ---

Hassina Sherjan SWOT Analysis / TOWS Matrix

Robert G. Eccles, George Serafeim, Philippa Eccles , Leadership & Managing People


Zara: IT for Fast Fashion, Spanish Version SWOT Analysis / TOWS Matrix

Andrew McAfee, Anders Sjoman, Vincent Dessain , Technology & Operations


Hill & Knowlton: Knowledge Management SWOT Analysis / TOWS Matrix

Darren Meister, Ken Mark , Technology & Operations


Harassment at Work? SWOT Analysis / TOWS Matrix

Lynn Sharp Paine, Dale O. Coxe , Leadership & Managing People


Calaveras Vineyards SWOT Analysis / TOWS Matrix

Robert F. Bruner , Finance & Accounting


Vietnam: Market Entry Decisions SWOT Analysis / TOWS Matrix

John A. Quelch, David J. Arnold , Sales & Marketing


Emerging Life Sciences Ventures: The Quest for Legitimacy SWOT Analysis / TOWS Matrix

Donald F. Kuratko, Travis J. Brown , Innovation & Entrepreneurship


The Beer Cases (A): A-B InBev SWOT Analysis / TOWS Matrix

Andrew Delios, Donna Jimenez , Strategy & Execution


Donna Karan International, Inc. SWOT Analysis / TOWS Matrix

Krishna G. Palepu, Sarayu Srinivasan , Finance & Accounting