Public Private Partnership: London Underground Limited SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

Case Study SWOT Analysis Solution

Case Study Description of Public Private Partnership: London Underground Limited


In 2007, Hong Kong MTR Corporation Limited (MTRC) was offered a 20% stake in Metronet Rail (Metronet), one of the two private sector engineering consortia contracted to run and maintain the London Underground rail network, under a 30-year public private partnership (PPP) agreement with London Underground Limited (LUL). This investment had the potential to transform MTRC from a local rail operator into an international player, giving the Company a major foothold in operating urban rail systems in Europe. However, the LUL PPP was widely regarded as one of the most complex private finance arrangements in the UK public sector, and there were a host of uncertainties for Hong Kong MTRC to contend with about its ability to make a success of the project. This case would allow students to explore the motives behind the PPP agreements to operate government assets and the implications of PPP for management's operating and financial strategy. At the same time, students can also evaluate the offer made to the MTRC and the appropriateness of the Company's acceptance.

Authors :: Arthur McInnes, Frederik Pretorius, Alison Bate

Topics :: Finance & Accounting

Tags :: Joint ventures, Mergers & acquisitions, Operations management, Project management, SWOT Analysis, SWOT Matrix, TOWS, Weighted SWOT Analysis

Swot Analysis of "Public Private Partnership: London Underground Limited" written by Arthur McInnes, Frederik Pretorius, Alison Bate includes – strengths weakness that are internal strategic factors of the organization, and opportunities and threats that Mtrc Ppp facing as an external strategic factors. Some of the topics covered in Public Private Partnership: London Underground Limited case study are - Strategic Management Strategies, Joint ventures, Mergers & acquisitions, Operations management, Project management and Finance & Accounting.


Some of the macro environment factors that can be used to understand the Public Private Partnership: London Underground Limited casestudy better are - – digital marketing is dominated by two big players Facebook and Google, challanges to central banks by blockchain based private currencies, supply chains are disrupted by pandemic , technology disruption, cloud computing is disrupting traditional business models, geopolitical disruptions, competitive advantages are harder to sustain because of technology dispersion, increasing inequality as vast percentage of new income is going to the top 1%, central banks are concerned over increasing inflation, etc



12 Hrs

$59.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

24 Hrs

$49.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

48 Hrs

$39.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now







Introduction to SWOT Analysis of Public Private Partnership: London Underground Limited


SWOT stands for an organization’s Strengths, Weaknesses, Opportunities and Threats . At Oak Spring University , we believe that protagonist in Public Private Partnership: London Underground Limited case study can use SWOT analysis as a strategic management tool to assess the current internal strengths and weaknesses of the Mtrc Ppp, and to figure out the opportunities and threats in the macro environment – technological, environmental, political, economic, social, demographic, etc in which Mtrc Ppp operates in.

According to Harvard Business Review, 75% of the managers use SWOT analysis for various purposes such as – evaluating current scenario, strategic planning, new venture feasibility, personal growth goals, new market entry, Go To market strategies, portfolio management and strategic trade-off assessment, organizational restructuring, etc.




SWOT Objectives / Importance of SWOT Analysis and SWOT Matrix


SWOT analysis of Public Private Partnership: London Underground Limited can be done for the following purposes –
1. Strategic planning using facts provided in Public Private Partnership: London Underground Limited case study
2. Improving business portfolio management of Mtrc Ppp
3. Assessing feasibility of the new initiative in Finance & Accounting field.
4. Making a Finance & Accounting topic specific business decision
5. Set goals for the organization
6. Organizational restructuring of Mtrc Ppp




Strengths Public Private Partnership: London Underground Limited | Internal Strategic Factors
What are Strengths in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The strengths of Mtrc Ppp in Public Private Partnership: London Underground Limited Harvard Business Review case study are -

Cross disciplinary teams

– Horizontal connected teams at the Mtrc Ppp are driving operational speed, building greater agility, and keeping the organization nimble to compete with new competitors. It helps are organization to ideate new ideas, and execute them swiftly in the marketplace.

Operational resilience

– The operational resilience strategy in the Public Private Partnership: London Underground Limited Harvard Business Review case study comprises – understanding the underlying the factors in the industry, building diversified operations across different geographies so that disruption in one part of the world doesn’t impact the overall performance of the firm, and integrating the various business operations and processes through its digital transformation drive.

Successful track record of launching new products

– Mtrc Ppp has launched numerous new products in last few years, keeping in mind evolving customer preferences and competitive pressures. Mtrc Ppp has effective processes in place that helps in exploring new product needs, doing quick pilot testing, and then launching the products quickly using its extensive distribution network.

Analytics focus

– Mtrc Ppp is putting a lot of focus on utilizing the power of analytics in business decision making. This has put it among the leading players in the industry. The technology infrastructure suggested by Arthur McInnes, Frederik Pretorius, Alison Bate can also help it to harness the power of analytics for – marketing optimization, demand forecasting, customer relationship management, inventory management, information sharing across the value chain etc.

Sustainable margins compare to other players in Finance & Accounting industry

– Public Private Partnership: London Underground Limited firm has clearly differentiated products in the market place. This has enabled Mtrc Ppp to fetch slight price premium compare to the competitors in the Finance & Accounting industry. The sustainable margins have also helped Mtrc Ppp to invest into research and development (R&D) and innovation.

Diverse revenue streams

– Mtrc Ppp is present in almost all the verticals within the industry. This has provided firm in Public Private Partnership: London Underground Limited case study a diverse revenue stream that has helped it to survive disruptions such as global pandemic in Covid-19, financial disruption of 2008, and supply chain disruption of 2021.

Superior customer experience

– The customer experience strategy of Mtrc Ppp in the segment is based on four key concepts – personalization, simplification of complex needs, prompt response, and continuous engagement.

Ability to lead change in Finance & Accounting field

– Mtrc Ppp is one of the leading players in its industry. Over the years it has not only transformed the business landscape in its segment but also across the whole industry. The ability to lead change has enabled Mtrc Ppp in – penetrating new markets, reaching out to new customers, and providing different value propositions to different customers in the international markets.

Training and development

– Mtrc Ppp has one of the best training and development program in the industry. The effectiveness of the training programs can be measured in Public Private Partnership: London Underground Limited Harvard Business Review case study by analyzing – employees retention, in-house promotion, loyalty, new venture initiation, lack of conflict, and high level of both employees and customer engagement.

Effective Research and Development (R&D)

– Mtrc Ppp has innovation driven culture where significant part of the revenues are spent on the research and development activities. This has resulted in, as mentioned in case study Public Private Partnership: London Underground Limited - staying ahead in the industry in terms of – new product launches, superior customer experience, highly competitive pricing strategies, and great returns to the shareholders.

Learning organization

- Mtrc Ppp is a learning organization. It has inculcated three key characters of learning organization in its processes and operations – exploration, creativity, and expansiveness. The work place at Mtrc Ppp is open place that encourages instructiveness, ideation, open minded discussions, and creativity. Employees and leaders in Public Private Partnership: London Underground Limited Harvard Business Review case study emphasize – knowledge, initiative, and innovation.

Organizational Resilience of Mtrc Ppp

– The covid-19 pandemic has put organizational resilience at the centre of everthing that Mtrc Ppp does. Organizational resilience comprises - Financial Resilience, Operational Resilience, Technological Resilience, Organizational Resilience, Business Model Resilience, and Reputation Resilience.






Weaknesses Public Private Partnership: London Underground Limited | Internal Strategic Factors
What are Weaknesses in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The weaknesses of Public Private Partnership: London Underground Limited are -

Aligning sales with marketing

– It come across in the case study Public Private Partnership: London Underground Limited that the firm needs to have more collaboration between its sales team and marketing team. Sales professionals in the industry have deep experience in developing customer relationships. Marketing department in the case Public Private Partnership: London Underground Limited can leverage the sales team experience to cultivate customer relationships as Mtrc Ppp is planning to shift buying processes online.

Workers concerns about automation

– As automation is fast increasing in the segment, Mtrc Ppp needs to come up with a strategy to reduce the workers concern regarding automation. Without a clear strategy, it could lead to disruption and uncertainty within the organization.

Skills based hiring

– The stress on hiring functional specialists at Mtrc Ppp has created an environment where the organization is dominated by functional specialists rather than management generalist. This has resulted into product oriented approach rather than marketing oriented approach or consumers oriented approach.

Ability to respond to the competition

– As the decision making is very deliberative, highlighted in the case study Public Private Partnership: London Underground Limited, in the dynamic environment Mtrc Ppp has struggled to respond to the nimble upstart competition. Mtrc Ppp has reasonably good record with similar level competitors but it has struggled with new entrants taking away niches of its business.

High dependence on star products

– The top 2 products and services of the firm as mentioned in the Public Private Partnership: London Underground Limited HBR case study still accounts for major business revenue. This dependence on star products in has resulted into insufficient focus on developing new products, even though Mtrc Ppp has relatively successful track record of launching new products.

Slow to strategic competitive environment developments

– As Public Private Partnership: London Underground Limited HBR case study mentions - Mtrc Ppp takes time to assess the upcoming competitions. This has led to missing out on atleast 2-3 big opportunities in the industry in last five years.

High dependence on existing supply chain

– The disruption in the global supply chains because of the Covid-19 pandemic and blockage of the Suez Canal illustrated the fragile nature of Mtrc Ppp supply chain. Even after few cautionary changes mentioned in the HBR case study - Public Private Partnership: London Underground Limited, it is still heavily dependent upon the existing supply chain. The existing supply chain though brings in cost efficiencies but it has left Mtrc Ppp vulnerable to further global disruptions in South East Asia.

Products dominated business model

– Even though Mtrc Ppp has some of the most successful products in the industry, this business model has made each new product launch extremely critical for continuous financial growth of the organization. firm in the HBR case study - Public Private Partnership: London Underground Limited should strive to include more intangible value offerings along with its core products and services.

Employees’ incomplete understanding of strategy

– From the instances in the HBR case study Public Private Partnership: London Underground Limited, it seems that the employees of Mtrc Ppp don’t have comprehensive understanding of the firm’s strategy. This is reflected in number of promotional campaigns over the last few years that had mixed messaging and competing priorities. Some of the strategic activities and services promoted in the promotional campaigns were not consistent with the organization’s strategy.

Capital Spending Reduction

– Even during the low interest decade, Mtrc Ppp has not been able to do capital spending to the tune of the competition. This has resulted into fewer innovations and company facing stiff competition from both existing competitors and new entrants who are disrupting the industry using digital technology.

Interest costs

– Compare to the competition, Mtrc Ppp has borrowed money from the capital market at higher rates. It needs to restructure the interest payment and costs so that it can compete better and improve profitability.




Opportunities Public Private Partnership: London Underground Limited | External Strategic Factors
What are Opportunities in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The opportunities highlighted in the Harvard Business Review case study Public Private Partnership: London Underground Limited are -

Buying journey improvements

– Mtrc Ppp can improve the customer journey of consumers in the industry by using analytics and artificial intelligence. Public Private Partnership: London Underground Limited suggest that firm can provide automated chats to help consumers solve their own problems, provide online suggestions to get maximum out of the products and services, and help consumers to build a community where they can interact with each other to develop new features and uses.

Low interest rates

– Even though inflation is raising its head in most developed economies, Mtrc Ppp can still utilize the low interest rates to borrow money for capital investment. Secondly it can also use the increase of government spending in infrastructure projects to get new business.

Reforming the budgeting process

- By establishing new metrics that will be used to evaluate both existing and potential projects Mtrc Ppp can not only reduce the costs of the project but also help it in integrating the projects with other processes within the organization.

Redefining models of collaboration and team work

– As explained in the weaknesses section, Mtrc Ppp is facing challenges because of the dominance of functional experts in the organization. Public Private Partnership: London Underground Limited case study suggests that firm can utilize new technology to build more coordinated teams and streamline operations and communications using tools such as CAD, Zoom, etc.

Increase in government spending

– As the United States and other governments are increasing social spending and infrastructure spending to build economies post Covid-19, Mtrc Ppp can use these opportunities to build new business models that can help the communities that Mtrc Ppp operates in. Secondly it can use opportunities from government spending in Finance & Accounting sector.

Harnessing reconfiguration of the global supply chains

– As the trade war between US and China heats up in the coming years, Mtrc Ppp can build a diversified supply chain model across various countries in - South East Asia, India, and other parts of the world. This reconfiguration of global supply chain can help, as suggested in case study, Public Private Partnership: London Underground Limited, to buy more products closer to the markets, and it can leverage its size and influence to get better deal from the local markets.

Loyalty marketing

– Mtrc Ppp has focused on building a highly responsive customer relationship management platform. This platform is built on in-house data and driven by analytics and artificial intelligence. The customer analytics can help the organization to fine tune its loyalty marketing efforts, increase the wallet share of the organization, reduce wastage on mainstream advertising spending, build better pricing strategies using personalization, etc.

Manufacturing automation

– Mtrc Ppp can use the latest technology developments to improve its manufacturing and designing process in Finance & Accounting segment. It can use CAD and 3D printing to build a quick prototype and pilot testing products. It can leverage automation using machine learning and artificial intelligence to do faster production at lowers costs, and it can leverage the growth in satellite and tracking technologies to improve inventory management, transportation, and shipping.

Changes in consumer behavior post Covid-19

– Consumer behavior has changed in the Finance & Accounting industry because of Covid-19 restrictions. Some of this behavior will stay once things get back to normal. Mtrc Ppp can take advantage of these changes in consumer behavior to build a far more efficient business model. For example consumer regular ordering of products can reduce both last mile delivery costs and market penetration costs. Mtrc Ppp can further use this consumer data to build better customer loyalty, provide better products and service collection, and improve the value proposition in inflationary times.

Creating value in data economy

– The success of analytics program of Mtrc Ppp has opened avenues for new revenue streams for the organization in the industry. This can help Mtrc Ppp to build a more holistic ecosystem as suggested in the Public Private Partnership: London Underground Limited case study. Mtrc Ppp can build new products and services such as - data insight services, data privacy related products, data based consulting services, etc.

Lowering marketing communication costs

– 5G expansion will open new opportunities for Mtrc Ppp in the field of marketing communication. It will bring down the cost of doing business, provide technology platform to build new products in the Finance & Accounting segment, and it will provide faster access to the consumers.

Remote work and new talent hiring opportunities

– The widespread usage of remote working technologies during Covid-19 has opened opportunities for Mtrc Ppp to expand its talent hiring zone. According to McKinsey Global Institute, 20% of the high end workforce in fields such as finance, information technology, can continously work from remote local post Covid-19. This presents a really great opportunity for Mtrc Ppp to hire the very best people irrespective of their geographical location.

Learning at scale

– Online learning technologies has now opened space for Mtrc Ppp to conduct training and development for its employees across the world. This will result in not only reducing the cost of training but also help employees in different part of the world to integrate with the headquarter work culture, ethos, and standards.




Threats Public Private Partnership: London Underground Limited External Strategic Factors
What are Threats in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The threats mentioned in the HBR case study Public Private Partnership: London Underground Limited are -

Capital market disruption

– During the Covid-19, Dow Jones has touched record high. The valuations of a number of companies are way beyond their existing business model potential. This can lead to capital market correction which can put a number of suppliers, collaborators, value chain partners in great financial difficulty. It will directly impact the business of Mtrc Ppp.

Technology acceleration in Forth Industrial Revolution

– Mtrc Ppp has witnessed rapid integration of technology during Covid-19 in the Finance & Accounting industry. As one of the leading players in the industry, Mtrc Ppp needs to keep up with the evolution of technology in the Finance & Accounting sector. According to Mckinsey study top managers believe that the adoption of technology in operations, communications is 20-25 times faster than what they planned in the beginning of 2019.

Environmental challenges

– Mtrc Ppp needs to have a robust strategy against the disruptions arising from climate change and energy requirements. EU has identified it as key priority area and spending 30% of its 880 billion Euros European post Covid-19 recovery funds on green technology. Mtrc Ppp can take advantage of this fund but it will also bring new competitors in the Finance & Accounting industry.

Trade war between China and United States

– The trade war between two of the biggest economies can hugely impact the opportunities for Mtrc Ppp in the Finance & Accounting industry. The Finance & Accounting industry is already at various protected from local competition in China, with the rise of trade war the protection levels may go up. This presents a clear threat of current business model in Chinese market.

Aging population

– As the populations of most advanced economies are aging, it will lead to high social security costs, higher savings among population, and lower demand for goods and services in the economy. The household savings in US, France, UK, Germany, and Japan are growing faster than predicted because of uncertainty caused by pandemic.

Stagnating economy with rate increase

– Mtrc Ppp can face lack of demand in the market place because of Fed actions to reduce inflation. This can lead to sluggish growth in the economy, lower demands, lower investments, higher borrowing costs, and consolidation in the field.

Easy access to finance

– Easy access to finance in Finance & Accounting field will also reduce the barriers to entry in the industry, thus putting downward pressure on the prices because of increasing competition. Mtrc Ppp can utilize it by borrowing at lower rates and invest it into research and development, capital expenditure to fortify its core competitive advantage.

Technology disruption because of hacks, piracy etc

– The colonial pipeline illustrated, how vulnerable modern organization are to international hackers, miscreants, and disruptors. The cyber security interruption, data leaks, etc can seriously jeopardize the future growth of the organization.

Regulatory challenges

– Mtrc Ppp needs to prepare for regulatory challenges as consumer protection groups and other pressure groups are vigorously advocating for more regulations on big business - to reduce inequality, to create a level playing field, to product data privacy and consumer privacy, to reduce the influence of big money on democratic institutions, etc. This can lead to significant changes in the Finance & Accounting industry regulations.

Instability in the European markets

– European Union markets are facing three big challenges post Covid – expanded balance sheets, Brexit related business disruption, and aggressive Russia looking to distract the existing security mechanism. Mtrc Ppp will face different problems in different parts of Europe. For example it will face inflationary pressures in UK, France, and Germany, balance sheet expansion and demand challenges in Southern European countries, and geopolitical instability in the Eastern Europe.

High level of anxiety and lack of motivation

– the Great Resignation in United States is the sign of broader dissatisfaction among the workforce in United States. Mtrc Ppp needs to understand the core reasons impacting the Finance & Accounting industry. This will help it in building a better workplace.

Barriers of entry lowering

– As technology is more democratized, the barriers to entry in the industry are lowering. It can presents Mtrc Ppp with greater competitive threats in the near to medium future. Secondly it will also put downward pressure on pricing throughout the sector.

Backlash against dominant players

– US Congress and other legislative arms of the government are getting tough on big business especially technology companies. The digital arm of Mtrc Ppp business can come under increasing regulations regarding data privacy, data security, etc.




Weighted SWOT Analysis of Public Private Partnership: London Underground Limited Template, Example


Not all factors mentioned under the Strengths, Weakness, Opportunities, and Threats quadrants in the SWOT Analysis are equal. Managers in the HBR case study Public Private Partnership: London Underground Limited needs to zero down on the relative importance of each factor mentioned in the Strengths, Weakness, Opportunities, and Threats quadrants. We can provide the relative importance to each factor by assigning relative weights. Weighted SWOT analysis process is a three stage process –

First stage for doing weighted SWOT analysis of the case study Public Private Partnership: London Underground Limited is to rank the strengths and weaknesses of the organization. This will help you to assess the most important strengths and weaknesses of the firm and which one of the strengths and weaknesses mentioned in the initial lists are marginal and can be left out.

Second stage for conducting weighted SWOT analysis of the Harvard case study Public Private Partnership: London Underground Limited is to give probabilities to the external strategic factors thus better understanding the opportunities and threats arising out of macro environment changes and developments.

Third stage of constructing weighted SWOT analysis of Public Private Partnership: London Underground Limited is to provide strategic recommendations includes – joining likelihood of external strategic factors such as opportunities and threats to the internal strategic factors – strengths and weaknesses. You should start with external factors as they will provide the direction of the overall industry. Secondly by joining probabilities with internal strategic factors can help the company not only strategic fit but also the most probably strategic trade-off that Mtrc Ppp needs to make to build a sustainable competitive advantage.



--- ---

Sustainability Through Open Innovation: Carlsberg and the Green Fiber Bottle SWOT Analysis / TOWS Matrix

Henry W. Chesbrough, Marcel Bogers, Robert Strand , Innovation & Entrepreneurship


Beijing Xiaomi Technology Co.: Growth Via Online Channels SWOT Analysis / TOWS Matrix

Miao Cui, Yanhong Guo, Feixiang Peng, Jilong Wang , Sales & Marketing


The Maine Food Cluster Project SWOT Analysis / TOWS Matrix

Karen Gordon Mills, Aldo Sesia , Strategy & Execution


Winning the Digital War for Talent SWOT Analysis / TOWS Matrix

Gerald C. Kane, Doug Palmer, Anh Nguyen Phillips, David Kiron , Leadership & Managing People


Hamptonshire Express SWOT Analysis / TOWS Matrix

V.G. Narayanan, Ananth Raman , Technology & Operations


Dubailand: Destination Dubai SWOT Analysis / TOWS Matrix

William Goetzmann, Irina Tarsis , Global Business


Chalhoub Group: A Luxury Success Story in the Middle East SWOT Analysis / TOWS Matrix

Frederic Godart, Andrew Shipilov, Brian Henry, Nancy Leung , Leadership & Managing People


President's Choice Financial SWOT Analysis / TOWS Matrix

Jeff Moretz, Chirag Surti , Strategy & Execution


China Internet and Search Market SWOT Analysis / TOWS Matrix

Robert A. Burgelman, Ming Lei , Strategy & Execution


Social Media: A Tool for Open Innovation SWOT Analysis / TOWS Matrix

Matthew Mount, Marian Garcia Martinez , Innovation & Entrepreneurship