Too Much Alcohol at a Remote Construction Site SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

Case Study SWOT Analysis Solution

Case Study Description of Too Much Alcohol at a Remote Construction Site


In September 2014, an American expatriate project manager at High-Tech Construction Pvt. Ltd. (High-Tech) received a late-night call saying that an engineer at a remote project site in India was extremely ill after consuming alcohol at an employee party. The driver would not take the sick employee to the hospital unless the project manager gave permission, but would giving permission drag High-Tech into a complicated situation? The expatriate manager was unsure of the legal ramifications involved in death or injury due to drinking. In addition, he was concerned about the effect on the company if the media was involved. Because he was an American in a multinational company with Indian employees, the story was potentially more saleable. Furthermore, was it prudent to inform the sick employee's parents yet, or should he call the head of the human resources department for advice? As the project manager, he would have to make the final decision. It had been just a couple months since he arrived in India and less than a month since the start of work on the current project, and now he had a crisis to deal with. Soumendra N. Bagchi is affiliated with XLRI School of Management & Human Resources, C. H. Area (East). Rajeev Sharma is affiliated with XLRI School of Management.

Authors :: Soumendra N. Bagchi, Rajeev Sharma

Topics :: Leadership & Managing People

Tags :: Leadership, Project management, SWOT Analysis, SWOT Matrix, TOWS, Weighted SWOT Analysis

Swot Analysis of "Too Much Alcohol at a Remote Construction Site" written by Soumendra N. Bagchi, Rajeev Sharma includes – strengths weakness that are internal strategic factors of the organization, and opportunities and threats that Permission Project facing as an external strategic factors. Some of the topics covered in Too Much Alcohol at a Remote Construction Site case study are - Strategic Management Strategies, Leadership, Project management and Leadership & Managing People.


Some of the macro environment factors that can be used to understand the Too Much Alcohol at a Remote Construction Site casestudy better are - – cloud computing is disrupting traditional business models, banking and financial system is disrupted by Bitcoin and other crypto currencies, wage bills are increasing, customer relationship management is fast transforming because of increasing concerns over data privacy, digital marketing is dominated by two big players Facebook and Google, geopolitical disruptions, increasing government debt because of Covid-19 spendings, talent flight as more people leaving formal jobs, there is increasing trade war between United States & China, etc



12 Hrs

$59.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

24 Hrs

$49.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now

48 Hrs

$39.99
per Page
  • 100% Plagiarism Free
  • On Time Delivery | 27x7
  • PayPal Secure
  • 300 Words / Page
  • Buy Now







Introduction to SWOT Analysis of Too Much Alcohol at a Remote Construction Site


SWOT stands for an organization’s Strengths, Weaknesses, Opportunities and Threats . At Oak Spring University , we believe that protagonist in Too Much Alcohol at a Remote Construction Site case study can use SWOT analysis as a strategic management tool to assess the current internal strengths and weaknesses of the Permission Project, and to figure out the opportunities and threats in the macro environment – technological, environmental, political, economic, social, demographic, etc in which Permission Project operates in.

According to Harvard Business Review, 75% of the managers use SWOT analysis for various purposes such as – evaluating current scenario, strategic planning, new venture feasibility, personal growth goals, new market entry, Go To market strategies, portfolio management and strategic trade-off assessment, organizational restructuring, etc.




SWOT Objectives / Importance of SWOT Analysis and SWOT Matrix


SWOT analysis of Too Much Alcohol at a Remote Construction Site can be done for the following purposes –
1. Strategic planning using facts provided in Too Much Alcohol at a Remote Construction Site case study
2. Improving business portfolio management of Permission Project
3. Assessing feasibility of the new initiative in Leadership & Managing People field.
4. Making a Leadership & Managing People topic specific business decision
5. Set goals for the organization
6. Organizational restructuring of Permission Project




Strengths Too Much Alcohol at a Remote Construction Site | Internal Strategic Factors
What are Strengths in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The strengths of Permission Project in Too Much Alcohol at a Remote Construction Site Harvard Business Review case study are -

Sustainable margins compare to other players in Leadership & Managing People industry

– Too Much Alcohol at a Remote Construction Site firm has clearly differentiated products in the market place. This has enabled Permission Project to fetch slight price premium compare to the competitors in the Leadership & Managing People industry. The sustainable margins have also helped Permission Project to invest into research and development (R&D) and innovation.

Analytics focus

– Permission Project is putting a lot of focus on utilizing the power of analytics in business decision making. This has put it among the leading players in the industry. The technology infrastructure suggested by Soumendra N. Bagchi, Rajeev Sharma can also help it to harness the power of analytics for – marketing optimization, demand forecasting, customer relationship management, inventory management, information sharing across the value chain etc.

Operational resilience

– The operational resilience strategy in the Too Much Alcohol at a Remote Construction Site Harvard Business Review case study comprises – understanding the underlying the factors in the industry, building diversified operations across different geographies so that disruption in one part of the world doesn’t impact the overall performance of the firm, and integrating the various business operations and processes through its digital transformation drive.

Learning organization

- Permission Project is a learning organization. It has inculcated three key characters of learning organization in its processes and operations – exploration, creativity, and expansiveness. The work place at Permission Project is open place that encourages instructiveness, ideation, open minded discussions, and creativity. Employees and leaders in Too Much Alcohol at a Remote Construction Site Harvard Business Review case study emphasize – knowledge, initiative, and innovation.

Organizational Resilience of Permission Project

– The covid-19 pandemic has put organizational resilience at the centre of everthing that Permission Project does. Organizational resilience comprises - Financial Resilience, Operational Resilience, Technological Resilience, Organizational Resilience, Business Model Resilience, and Reputation Resilience.

High brand equity

– Permission Project has strong brand awareness and brand recognition among both - the exiting customers and potential new customers. Strong brand equity has enabled Permission Project to keep acquiring new customers and building profitable relationship with both the new and loyal customers.

Training and development

– Permission Project has one of the best training and development program in the industry. The effectiveness of the training programs can be measured in Too Much Alcohol at a Remote Construction Site Harvard Business Review case study by analyzing – employees retention, in-house promotion, loyalty, new venture initiation, lack of conflict, and high level of both employees and customer engagement.

Successful track record of launching new products

– Permission Project has launched numerous new products in last few years, keeping in mind evolving customer preferences and competitive pressures. Permission Project has effective processes in place that helps in exploring new product needs, doing quick pilot testing, and then launching the products quickly using its extensive distribution network.

Highly skilled collaborators

– Permission Project has highly efficient outsourcing and offshoring strategy. It has resulted in greater operational flexibility and bringing down the costs in highly price sensitive segment. Secondly the value chain collaborators of the firm in Too Much Alcohol at a Remote Construction Site HBR case study have helped the firm to develop new products and bring them quickly to the marketplace.

Superior customer experience

– The customer experience strategy of Permission Project in the segment is based on four key concepts – personalization, simplification of complex needs, prompt response, and continuous engagement.

Diverse revenue streams

– Permission Project is present in almost all the verticals within the industry. This has provided firm in Too Much Alcohol at a Remote Construction Site case study a diverse revenue stream that has helped it to survive disruptions such as global pandemic in Covid-19, financial disruption of 2008, and supply chain disruption of 2021.

Ability to recruit top talent

– Permission Project is one of the leading recruiters in the industry. Managers in the Too Much Alcohol at a Remote Construction Site are in a position to attract the best talent available. The firm has a robust talent identification program that helps in identifying the brightest.






Weaknesses Too Much Alcohol at a Remote Construction Site | Internal Strategic Factors
What are Weaknesses in SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis

The weaknesses of Too Much Alcohol at a Remote Construction Site are -

Slow decision making process

– As mentioned earlier in the report, Permission Project has a very deliberative decision making approach. This approach has resulted in prudent decisions, but it has also resulted in missing opportunities in the industry over the last five years. Permission Project even though has strong showing on digital transformation primary two stages, it has struggled to capitalize the power of digital transformation in marketing efforts and new venture efforts.

Lack of clear differentiation of Permission Project products

– To increase the profitability and margins on the products, Permission Project needs to provide more differentiated products than what it is currently offering in the marketplace.

Workers concerns about automation

– As automation is fast increasing in the segment, Permission Project needs to come up with a strategy to reduce the workers concern regarding automation. Without a clear strategy, it could lead to disruption and uncertainty within the organization.

High dependence on existing supply chain

– The disruption in the global supply chains because of the Covid-19 pandemic and blockage of the Suez Canal illustrated the fragile nature of Permission Project supply chain. Even after few cautionary changes mentioned in the HBR case study - Too Much Alcohol at a Remote Construction Site, it is still heavily dependent upon the existing supply chain. The existing supply chain though brings in cost efficiencies but it has left Permission Project vulnerable to further global disruptions in South East Asia.

Employees’ incomplete understanding of strategy

– From the instances in the HBR case study Too Much Alcohol at a Remote Construction Site, it seems that the employees of Permission Project don’t have comprehensive understanding of the firm’s strategy. This is reflected in number of promotional campaigns over the last few years that had mixed messaging and competing priorities. Some of the strategic activities and services promoted in the promotional campaigns were not consistent with the organization’s strategy.

Products dominated business model

– Even though Permission Project has some of the most successful products in the industry, this business model has made each new product launch extremely critical for continuous financial growth of the organization. firm in the HBR case study - Too Much Alcohol at a Remote Construction Site should strive to include more intangible value offerings along with its core products and services.

Ability to respond to the competition

– As the decision making is very deliberative, highlighted in the case study Too Much Alcohol at a Remote Construction Site, in the dynamic environment Permission Project has struggled to respond to the nimble upstart competition. Permission Project has reasonably good record with similar level competitors but it has struggled with new entrants taking away niches of its business.

Slow to strategic competitive environment developments

– As Too Much Alcohol at a Remote Construction Site HBR case study mentions - Permission Project takes time to assess the upcoming competitions. This has led to missing out on atleast 2-3 big opportunities in the industry in last five years.

Slow to harness new channels of communication

– Even though competitors are using new communication channels such as Instagram, Tiktok, and Snap, Permission Project is slow explore the new channels of communication. These new channels of communication mentioned in marketing section of case study Too Much Alcohol at a Remote Construction Site can help to provide better information regarding products and services. It can also build an online community to further reach out to potential customers.

No frontier risks strategy

– After analyzing the HBR case study Too Much Alcohol at a Remote Construction Site, it seems that company is thinking about the frontier risks that can impact Leadership & Managing People strategy. But it has very little resources allocation to manage the risks emerging from events such as natural disasters, climate change, melting of permafrost, tacking the rise of artificial intelligence, opportunities and threats emerging from commercialization of space etc.

Need for greater diversity

– Permission Project has taken concrete steps on diversity, equity, and inclusion. But the efforts so far has resulted in limited success. It needs to expand the recruitment and selection process to hire more people from the minorities and underprivileged background.




Opportunities Too Much Alcohol at a Remote Construction Site | External Strategic Factors
What are Opportunities in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The opportunities highlighted in the Harvard Business Review case study Too Much Alcohol at a Remote Construction Site are -

Reforming the budgeting process

- By establishing new metrics that will be used to evaluate both existing and potential projects Permission Project can not only reduce the costs of the project but also help it in integrating the projects with other processes within the organization.

Using analytics as competitive advantage

– Permission Project has spent a significant amount of money and effort to integrate analytics and machine learning into its operations in the sector. This continuous investment in analytics has enabled, as illustrated in the Harvard case study Too Much Alcohol at a Remote Construction Site - to build a competitive advantage using analytics. The analytics driven competitive advantage can help Permission Project to build faster Go To Market strategies, better consumer insights, developing relevant product features, and building a highly efficient supply chain.

Use of Bitcoin and other crypto currencies for transactions

– The popularity of Bitcoin and other crypto currencies as asset class and medium of transaction has opened new opportunities for Permission Project in the consumer business. Now Permission Project can target international markets with far fewer capital restrictions requirements than the existing system.

Remote work and new talent hiring opportunities

– The widespread usage of remote working technologies during Covid-19 has opened opportunities for Permission Project to expand its talent hiring zone. According to McKinsey Global Institute, 20% of the high end workforce in fields such as finance, information technology, can continously work from remote local post Covid-19. This presents a really great opportunity for Permission Project to hire the very best people irrespective of their geographical location.

Manufacturing automation

– Permission Project can use the latest technology developments to improve its manufacturing and designing process in Leadership & Managing People segment. It can use CAD and 3D printing to build a quick prototype and pilot testing products. It can leverage automation using machine learning and artificial intelligence to do faster production at lowers costs, and it can leverage the growth in satellite and tracking technologies to improve inventory management, transportation, and shipping.

Developing new processes and practices

– Permission Project can develop new processes and procedures in Leadership & Managing People industry using technology such as automation using artificial intelligence, real time transportation and products tracking, 3D modeling for concept development and new products pilot testing etc.

Better consumer reach

– The expansion of the 5G network will help Permission Project to increase its market reach. Permission Project will be able to reach out to new customers. Secondly 5G will also provide technology framework to build new tools and products that can help more immersive consumer experience and faster consumer journey.

Harnessing reconfiguration of the global supply chains

– As the trade war between US and China heats up in the coming years, Permission Project can build a diversified supply chain model across various countries in - South East Asia, India, and other parts of the world. This reconfiguration of global supply chain can help, as suggested in case study, Too Much Alcohol at a Remote Construction Site, to buy more products closer to the markets, and it can leverage its size and influence to get better deal from the local markets.

Finding new ways to collaborate

– Covid-19 has not only transformed business models of companies in Leadership & Managing People industry, but it has also influenced the consumer preferences. Permission Project can tie-up with other value chain partners to explore new opportunities regarding meeting customer demands and building a rewarding and engaging relationship.

Increase in government spending

– As the United States and other governments are increasing social spending and infrastructure spending to build economies post Covid-19, Permission Project can use these opportunities to build new business models that can help the communities that Permission Project operates in. Secondly it can use opportunities from government spending in Leadership & Managing People sector.

Creating value in data economy

– The success of analytics program of Permission Project has opened avenues for new revenue streams for the organization in the industry. This can help Permission Project to build a more holistic ecosystem as suggested in the Too Much Alcohol at a Remote Construction Site case study. Permission Project can build new products and services such as - data insight services, data privacy related products, data based consulting services, etc.

Identify volunteer opportunities

– Covid-19 has impacted working population in two ways – it has led to people soul searching about their professional choices, resulting in mass resignation. Secondly it has encouraged people to do things that they are passionate about. This has opened opportunities for businesses to build volunteer oriented socially driven projects. Permission Project can explore opportunities that can attract volunteers and are consistent with its mission and vision.

Lowering marketing communication costs

– 5G expansion will open new opportunities for Permission Project in the field of marketing communication. It will bring down the cost of doing business, provide technology platform to build new products in the Leadership & Managing People segment, and it will provide faster access to the consumers.




Threats Too Much Alcohol at a Remote Construction Site External Strategic Factors
What are Threats in the SWOT Analysis / TOWS Matrix / Weighted SWOT Analysis


The threats mentioned in the HBR case study Too Much Alcohol at a Remote Construction Site are -

Stagnating economy with rate increase

– Permission Project can face lack of demand in the market place because of Fed actions to reduce inflation. This can lead to sluggish growth in the economy, lower demands, lower investments, higher borrowing costs, and consolidation in the field.

Learning curve for new practices

– As the technology based on artificial intelligence and machine learning platform is getting complex, as highlighted in case study Too Much Alcohol at a Remote Construction Site, Permission Project may face longer learning curve for training and development of existing employees. This can open space for more nimble competitors in the field of Leadership & Managing People .

Increasing international competition and downward pressure on margins

– Apart from technology driven competitive advantage dilution, Permission Project can face downward pressure on margins from increasing competition from international players. The international players have stable revenue in their home market and can use those resources to penetrate prominent markets illustrated in HBR case study Too Much Alcohol at a Remote Construction Site .

Consumer confidence and its impact on Permission Project demand

– There is a high probability of declining consumer confidence, given – high inflammation rate, rise of gig economy, lower job stability, increasing cost of living, higher interest rates, and aging demography. All the factors contribute to people saving higher rate of their income, resulting in lower consumer demand in the industry and other sectors.

Capital market disruption

– During the Covid-19, Dow Jones has touched record high. The valuations of a number of companies are way beyond their existing business model potential. This can lead to capital market correction which can put a number of suppliers, collaborators, value chain partners in great financial difficulty. It will directly impact the business of Permission Project.

High level of anxiety and lack of motivation

– the Great Resignation in United States is the sign of broader dissatisfaction among the workforce in United States. Permission Project needs to understand the core reasons impacting the Leadership & Managing People industry. This will help it in building a better workplace.

Technology acceleration in Forth Industrial Revolution

– Permission Project has witnessed rapid integration of technology during Covid-19 in the Leadership & Managing People industry. As one of the leading players in the industry, Permission Project needs to keep up with the evolution of technology in the Leadership & Managing People sector. According to Mckinsey study top managers believe that the adoption of technology in operations, communications is 20-25 times faster than what they planned in the beginning of 2019.

Technology disruption because of hacks, piracy etc

– The colonial pipeline illustrated, how vulnerable modern organization are to international hackers, miscreants, and disruptors. The cyber security interruption, data leaks, etc can seriously jeopardize the future growth of the organization.

Easy access to finance

– Easy access to finance in Leadership & Managing People field will also reduce the barriers to entry in the industry, thus putting downward pressure on the prices because of increasing competition. Permission Project can utilize it by borrowing at lower rates and invest it into research and development, capital expenditure to fortify its core competitive advantage.

High dependence on third party suppliers

– Permission Project high dependence on third party suppliers can disrupt its processes and delivery mechanism. For example -the current troubles of car makers because of chip shortage is because the chip companies started producing chips for electronic companies rather than car manufacturers.

New competition

– After the dotcom bust of 2001, financial crisis of 2008-09, the business formation in US economy had declined. But in 2020 alone, there are more than 1.5 million new business applications in United States. This can lead to greater competition for Permission Project in the Leadership & Managing People sector and impact the bottomline of the organization.

Regulatory challenges

– Permission Project needs to prepare for regulatory challenges as consumer protection groups and other pressure groups are vigorously advocating for more regulations on big business - to reduce inequality, to create a level playing field, to product data privacy and consumer privacy, to reduce the influence of big money on democratic institutions, etc. This can lead to significant changes in the Leadership & Managing People industry regulations.

Shortening product life cycle

– it is one of the major threat that Permission Project is facing in Leadership & Managing People sector. It can lead to higher research and development costs, higher marketing expenses, lower customer loyalty, etc.




Weighted SWOT Analysis of Too Much Alcohol at a Remote Construction Site Template, Example


Not all factors mentioned under the Strengths, Weakness, Opportunities, and Threats quadrants in the SWOT Analysis are equal. Managers in the HBR case study Too Much Alcohol at a Remote Construction Site needs to zero down on the relative importance of each factor mentioned in the Strengths, Weakness, Opportunities, and Threats quadrants. We can provide the relative importance to each factor by assigning relative weights. Weighted SWOT analysis process is a three stage process –

First stage for doing weighted SWOT analysis of the case study Too Much Alcohol at a Remote Construction Site is to rank the strengths and weaknesses of the organization. This will help you to assess the most important strengths and weaknesses of the firm and which one of the strengths and weaknesses mentioned in the initial lists are marginal and can be left out.

Second stage for conducting weighted SWOT analysis of the Harvard case study Too Much Alcohol at a Remote Construction Site is to give probabilities to the external strategic factors thus better understanding the opportunities and threats arising out of macro environment changes and developments.

Third stage of constructing weighted SWOT analysis of Too Much Alcohol at a Remote Construction Site is to provide strategic recommendations includes – joining likelihood of external strategic factors such as opportunities and threats to the internal strategic factors – strengths and weaknesses. You should start with external factors as they will provide the direction of the overall industry. Secondly by joining probabilities with internal strategic factors can help the company not only strategic fit but also the most probably strategic trade-off that Permission Project needs to make to build a sustainable competitive advantage.



--- ---

Delivering Strategic Human Resource Management SWOT Analysis / TOWS Matrix

Boris Groysberg, Andrew N. McLean, Cate Reavis , Organizational Development


Steve Jackson Faces Resistance to Change SWOT Analysis / TOWS Matrix

Andrew C. Inkpen, Christine Pearson , Strategy & Execution


Sanofi Pasteur: The Dengue Vaccine Dilemma SWOT Analysis / TOWS Matrix

V. Kasturi Rangan, David E. Bloom, Vincent Dessain, Emilie Billaud , Global Business


Compagnie du Froid, S.A., Spanish Version SWOT Analysis / TOWS Matrix

Robert L. Simons, Antonio Davila , Finance & Accounting


Security Breach at TJX SWOT Analysis / TOWS Matrix

Nicole R.D. Haggerty, Chandra Sekhar Ramasastry , Technology & Operations


Work is Good: Branding the Employ+Ability Mission, Spanish Version SWOT Analysis / TOWS Matrix

Lynda M. Applegate, Susan Saltrick, Monica Higgins , Innovation & Entrepreneurship


PepsiCo: QTG Emerging Channel Investment SWOT Analysis / TOWS Matrix

Timothy M. Laseter , Organizational Development


GENICON: A Surgical Strike into Emerging Markets SWOT Analysis / TOWS Matrix

Allen H. Kupetz, Adam P. Tindall, Gary Haberland , Global Business


Ayala Corporation: One Family's Contribution to Nation Building SWOT Analysis / TOWS Matrix

Benoit Leleux, Anne Catrin Glemser , Leadership & Managing People


Capitalism and Democracy in a New World SWOT Analysis / TOWS Matrix

Bruce R. Scott, Sarah Potvin, Alison Adams , Strategy & Execution